== Generate Cash Flow Initialization Sheet: == | == Generate Cash Flow Initialization Sheet: == | ||
| + | # If your project is estimated using Estimate 2.0, follow [[Cash Flow Projection#Generate Cashflow Initialization Sheet]] | ||
| + | # If your project is existing, and note estimated using Estimate 2.0, follow [[Cash Flow Projection#Generate Cashflow Initialization Sheet]] | ||
| + | === Generate Cashflow Initialization Sheet === | ||
| + | When Estimate was completed, budgets will get [[Budget Upload|uploaded from Estimate 2.0 to Viewpoint]] through a sheet called Consolidation. Once Consolidation is completed, you can go to the Cash Flow Functions located under Budget/CashFlow Ribbon Tab to access cashflow functions. Click on "CashFlow" Button to generate the cash flow initialization sheet.<br> | ||
| + | [[File:Initiate to CashFlow Setting.gif|frame|center|Generate CashFlow Initialization Sheet]] | ||
| + | |||
| + | === Using A Provided Template === | ||
| + | If your project was note estimated using Estimate2.0, use the provided template to initialize the cash flow set up for your project. the template can be downloaded here. Follow instructions at [[Using Provided Template to Set Up Cash Flow Projection]] | ||
| + | |||
=== Change line item name and line total === | === Change line item name and line total === | ||
For a project on going, and you are asked to switch to this Cost Projection tool, you can use template provided and change the line item name and total to suite your project. | For a project on going, and you are asked to switch to this Cost Projection tool, you can use template provided and change the line item name and total to suite your project. | ||
[[File:CashFlow Initialization ChangeNameandTotalCost.gif|frame|center|Change name and total cost]] | [[File:CashFlow Initialization ChangeNameandTotalCost.gif|frame|center|Change name and total cost]] | ||
| − | |||
| − | |||
| − | |||
| − | |||
== Populate Cashflow monthly == | == Populate Cashflow monthly == | ||
Revision as of 16:28, 3 March 2023
Cash Flow Project is a new feature integrated with Estimate 2.0 - this guide is intended to give you a quick run down of the functions and give you a HOW TO.
In examples below, we will use a project that ONLY have Mechanical and Electrical scope to demonstrate the functions. The demonstration will focus on how to use the software instead of how the project should be projecting cash flow.
Generate Cash Flow Initialization Sheet:
- If your project is estimated using Estimate 2.0, follow Cash Flow Projection#Generate Cashflow Initialization Sheet
- If your project is existing, and note estimated using Estimate 2.0, follow Cash Flow Projection#Generate Cashflow Initialization Sheet
Generate Cashflow Initialization Sheet
When Estimate was completed, budgets will get uploaded from Estimate 2.0 to Viewpoint through a sheet called Consolidation. Once Consolidation is completed, you can go to the Cash Flow Functions located under Budget/CashFlow Ribbon Tab to access cashflow functions. Click on "CashFlow" Button to generate the cash flow initialization sheet.
Using A Provided Template
If your project was note estimated using Estimate2.0, use the provided template to initialize the cash flow set up for your project. the template can be downloaded here. Follow instructions at Using Provided Template to Set Up Cash Flow Projection
Change line item name and line total
For a project on going, and you are asked to switch to this Cost Projection tool, you can use template provided and change the line item name and total to suite your project.
Populate Cashflow monthly
Manually Changing Cashflow by Month.
With this sheet, you can manually change amount assigned to each month. Once amount entered, you will see the Remaining field of this line item changed, which shows either a + (under) or - (over). The final goal is to have the remaining field be 0.
Auto Populate the monthly billing by changing settings.
With this sheet, you can change setting items such as "Front Load", "Back Load", "From Date" and "To Date" to auto populate the monthly billing. The durations between two dates calculated is based on WORKING DAYS, which is calendar days excluding weekends, and Canadian Holidays.
While changing Front Load and Back Load, the monthly will also update to reflect this change. this will reset the remaining to 0. if on Monthly amount you see negative (-) numbers, it means the end loads are over the total budget. It worth noting that the front load and back load at initialization works slightly different than when tracking actuals.
Add additional month
When dates entered is not valid, or pass beyond the last column, the software will prompt for adding more columns.
You can do so by clicking on the "Add Month" Button.
Show or Hide Line Items
You can hide selected lines by how you typically do in Excel. I recommend use the checkboxes to keep the Format Consistent.
Turn into On-going Tracking (Actual and Forecast):
Generate On-Going Tracking Sheet
Once you believe you have populated the Cashflow for the entire project (Month 0), you can use the "Track!" button to set up the Tracking Sheet.
Elements on tracking sheet, and graph sheet
On the tracking sheet, the number you populated during the SET UP stage (previous section) is stored underneath each line for reference and comparison ONLY. There are some slight different on the functions. You will also notice another worksheet that contains the graph, and monthly bill and accumulated number is added as well.
Similar to Setting Sheet, you can change all the settings and monthly data, only a few difference with the Current Selected Date.
Set Current Date and start tracking Actuals
The example below shows how to set Current Date (this month should be different from Project Start Month in Estimate), and showing putting in the Actual Billed amount in the first month.
Current Date refer to the date of the most recent billing. The program uses this date to treat the
- amounts in current and previous month as Actual
- amounts in future months are projection.
When you change the Actual Amount, or amounts in current and previous month, the projections will update itself. When the projection updating, it will ignore the front load amount as the Front Load should already happened. The back Load will be acknowledged.
When you change the projection amount, or amounts in future months, the projections will not update itself, rather, the remaining will calculate the difference. Similar to manual update in the setting sheet.
When you change the settings, it will holds the Actual amounts, and only update the projections.