Difference between revisions of "Talk:Calculate Recoverable"

From SynWiki
Jump to navigation Jump to search
(Created page with "the recoverable is only a function for CM type of projects, so the CM rate box should be checked. this should also be mentioned in the manual as well.")
 
 
Line 1: Line 1:
−
the recoverable is only a function for CM type of projects, so the CM rate box should be checked. this should also be mentioned in the manual as well.
+
07/08/2021 Siyuan Wei: the recoverable is only a function for CM type of projects, so the CM rate box should be checked. this should also be mentioned in the manual as well.

Latest revision as of 05:05, 9 July 2021

07/08/2021 Siyuan Wei: the recoverable is only a function for CM type of projects, so the CM rate box should be checked. this should also be mentioned in the manual as well.