Difference between revisions of "Viewpoint Quick Reference"

From SynWiki
Jump to navigation Jump to search
(Created page with "Viewpoint Quick Reference • '''AP Job/WO Transaction Drilldown''' – Find each invoice by vendor/subtrade/employee per project • PO Drilldown – Each individual PO for...")
 
 
(8 intermediate revisions by 3 users not shown)
Line 1: Line 1:
−
Viewpoint Quick Reference
+
== Useful Programs ==
 +
=== Job Cost ===
 +
* '''JC Cost Projections''' – Where the PM completes their project forecast
 +
* '''JC Contracts''' – Contract items + contract item/bill descriptions are created and assigned here. Fee % (during COQ generation) is calculated here. This module receives changed pushed from PM module, this process is called "Interface".
 +
* '''JC Change Orders''' – This is where you go to un-interface approved change orders when you mess them up (Tax code, phase code, $ amounts, incorrect subtrade)
  
−
• '''AP Job/WO Transaction Drilldown''' – Find each invoice by vendor/subtrade/employee per project
+
=== Subcontract Ledger ===
−
• PO Drilldown – Each individual PO for the specified project is listed in alphabetical order by vendor
+
* '''SL Compliance''' – Subtrade signed contracts, insurance policies, and WCB documents are uploaded here to allow for accounting to pay the subcontractors  
−
• JC Original Estimate – Shows a breakdown of the initial estimate uploaded to VP
+
* '''SL Change Order Entry''' – This is where you go to un-interface subcontract change orders when you mess them up (Tax code, phase code, $ amounts, incorrect subtrade)
−
• JC Phase Master – Shows the master code list used for all projects
+
* '''SL Subcontract Entry''' - Not sure when to use this one?
−
• JC Job Master – Lists important project information such as PM, Super, reviewing consultant/owner, job phase codes, contract items (how is this different from PM Projects?)
+
 
−
• JC Job Phases – Shows code list for all projects (How is this different from JC Phase Master?)
+
=== Project Management ===
−
• JC Details – Not sure exactly what this one is for
+
* '''PM Firms''' – A list of all consultants, clients/owners, vendors, suppliers, subcontractors company wide
−
• JC Cost Projections – Where the PM completes their project forecast
+
* '''PM Project Firms''' - A list of all consultants, clients/owners, vendors, suppliers, subcontractors specific to each individual project (project directory)
−
• JC Contract Master – Contract items + contract item/bill descriptions are created and assigned here. Fee % is calculated here (how is this different from PM Contracts?)
+
* '''PM Projects''' – See note above for JC Job Master
−
• JC Committed Cost Drilldown – Breakdown of all committed costs by project phase code
+
* '''PM Contracts''' – See not above for JC Contract Master
−
• JC Change Orders – This is where you go to un-interface approved change orders when you mess them up (Tax code, phase code, $ amounts, incorrect subtrade)
+
* '''PM Subcontract Detail''' – Starting point for a subcontract. Phase code, cost type, vendor, SL #, contract amount, holdback %, and tax code are assigned here  
−
• JC Cost Totals Drilldown – Ability to pull backup for each cost recorded under the project
+
* '''PM Subcontracts''' – Additional detail for subcontracts added here, including scope of work, contract documents, execution date, and subcontract approval. If your subcontract change orders are giving you incorrect values for the subcontract amount, this is the place to check. This section can be used to directly add line items to subcontracts or subcontract revisions, one might find this helpful as it saves other steps.
−
• SL Compliance – Subtrade signed contracts, insurance policies, and WCB documents are uploaded here to allow for accounting to pay the subcontractors  
+
* '''PM Issues''' – Mostly useless. A leger of all potential cost impacts/problems with the project
−
• SL Change Order Entry – This is where you go to un-interface subcontract change orders when you mess them up (Tax code, phase code, $ amounts, incorrect subtrade)
+
* '''PM Change Orders''' - Not sure when to use this one?
−
• SL Subcontract Status Report – A breakdown of a subcontractor’s contract amount, and changes paid to the subcontractor to date
+
* '''PM Subcontract Change Orders''' – Create revisions to subcontractor’s contract amount  
−
• SL Subcontract Entry - Not sure when to use this one?
+
* '''PM Pending Change Orders''' – Create COQs/PCOs for the client. Can be used as a leger for replacing the issues log
−
• PM Firms – A list of all consultants, clients/owners, vendors, suppliers, subcontractors company wide
+
* '''PM Approved Change Orders''' – Where approved COQs/PCOs go and become ACOs  
−
• PM Project Firms - A list of all consultants, clients/owners, vendors, suppliers, subcontractors specific to each individual project (project directory)
+
* '''PM Interface''' – This is the bridge between the project team and accounting. Subcontracts, subcontract change orders, and approved change orders can be interfaced
−
• PM Projects – See note above for JC Job Master
+
* '''PM Submittal Register''' – List of all shop drawings, samples, mock-ups etc.  that are required for the project
−
• PM Contracts – See not above for JC Contract Master
+
* '''PM Request for Information''' – List of all questions raised by the contractor/subcontractor to the client/consultants
−
• PM Subcontract Detail – Starting point for a subcontract. Phase code, cost type, vendor, SL #, contract amount, holdback %, and tax code are assigned here  
+
 
−
• PM Subcontracts – Additional detail for subcontracts added here, including scope of work, contract documents, execution date, and subcontract approval. If your subcontract change orders are giving you incorrect values for the subcontract amount, this is the place to check  
+
== Useful Reports ==
−
• PM Issues – Mostly useless. A leger of all potential cost impacts/problems with the project
+
=== Accounts Payable ===
−
• PM Change Orders - Not sure when to use this one?
+
* '''AP Job/WO Transaction Drilldown''' – Find each invoice by vendor/subtrade/employee per project
−
• PM Subcontract Change Orders – Create revisions to subcontractor’s contract amount  
+
 
−
• PM Pending Change Orders – Create COQs/PCOs for the client. Can be used as a leger for replacing the issues log
+
=== Job Cost ===
−
• PM Approved Change Orders – Where approved COQs/PCOs go and become ACOs  
+
* '''JC Original Estimate''' – Shows a breakdown of the initial estimate uploaded to VP
−
• PM Interface – This is the bridge between the project team and accounting. Subcontracts, subcontract change orders, and approved change orders can be interfaced
+
* '''JC Phase Codes''' – Shows the master code list used for all projects
−
• PM Submittal Register – List of all shop drawings, samples, mock-ups etc.  that are required for the project
+
* '''JC Jobs''' – Lists important project information such as PM, Super, reviewing consultant/owner, job phase codes, contract items (how is this different from PM Projects?)
−
• PM Request for Information – List of all questions raised by the contractor/subcontractor to the client/consultants
+
* '''JC Job Phases''' – Shows code list for all projects (How is this different from JC Phase Master?)
−
• Synergy ACA Form (A-2013) – The standard Alberta Construction Association contract template. The template pulls information from PM Subcontract Detail and PM Subcontracts
+
* '''JC Details''' – Not sure exactly what this one is for
−
• Synergy JC Cost Report By Division – The project forecast report at a certain specified time interval
+
* '''JC Committed Cost Drilldown''' – Breakdown of all committed costs by project phase code
 +
* '''JC Cost Totals Drilldown''' – Ability to pull backup for each cost recorded under the project
 +
 
 +
=== Subcontract Ledger ===
 +
* '''SL Subcontract Status Report''' – A breakdown of a subcontractor’s contract amount, and changes paid to the subcontractor to date
 +
 
 +
=== Project Management ===
 +
 
 +
=== Purchase Order ===
 +
* '''PO Drilldown''' – Each individual PO for the specified project is listed in alphabetical order by vendor
 +
 
 +
== Non Viewpoint Reference ==
 +
* '''Synergy ACA Form (A-2013)''' – The standard Alberta Construction Association contract template. The template pulls information from PM Subcontract Detail and PM Subcontracts
 +
* '''Project Cost and Forecast''' and '''Project Cost and Forecast Letter Size''' – The project forecast report at a certain specified time interval
 +
[[Category:Viewpoint Fundamentals]]
 +
[[Category:Operations]]

Latest revision as of 20:36, 20 June 2023

Useful Programs

Job Cost

  • JC Cost Projections – Where the PM completes their project forecast
  • JC Contracts – Contract items + contract item/bill descriptions are created and assigned here. Fee % (during COQ generation) is calculated here. This module receives changed pushed from PM module, this process is called "Interface".
  • JC Change Orders – This is where you go to un-interface approved change orders when you mess them up (Tax code, phase code, $ amounts, incorrect subtrade)

Subcontract Ledger

  • SL Compliance – Subtrade signed contracts, insurance policies, and WCB documents are uploaded here to allow for accounting to pay the subcontractors
  • SL Change Order Entry – This is where you go to un-interface subcontract change orders when you mess them up (Tax code, phase code, $ amounts, incorrect subtrade)
  • SL Subcontract Entry - Not sure when to use this one?

Project Management

  • PM Firms – A list of all consultants, clients/owners, vendors, suppliers, subcontractors company wide
  • PM Project Firms - A list of all consultants, clients/owners, vendors, suppliers, subcontractors specific to each individual project (project directory)
  • PM Projects – See note above for JC Job Master
  • PM Contracts – See not above for JC Contract Master
  • PM Subcontract Detail – Starting point for a subcontract. Phase code, cost type, vendor, SL #, contract amount, holdback %, and tax code are assigned here
  • PM Subcontracts – Additional detail for subcontracts added here, including scope of work, contract documents, execution date, and subcontract approval. If your subcontract change orders are giving you incorrect values for the subcontract amount, this is the place to check. This section can be used to directly add line items to subcontracts or subcontract revisions, one might find this helpful as it saves other steps.
  • PM Issues – Mostly useless. A leger of all potential cost impacts/problems with the project
  • PM Change Orders - Not sure when to use this one?
  • PM Subcontract Change Orders – Create revisions to subcontractor’s contract amount
  • PM Pending Change Orders – Create COQs/PCOs for the client. Can be used as a leger for replacing the issues log
  • PM Approved Change Orders – Where approved COQs/PCOs go and become ACOs
  • PM Interface – This is the bridge between the project team and accounting. Subcontracts, subcontract change orders, and approved change orders can be interfaced
  • PM Submittal Register – List of all shop drawings, samples, mock-ups etc. that are required for the project
  • PM Request for Information – List of all questions raised by the contractor/subcontractor to the client/consultants

Useful Reports

Accounts Payable

  • AP Job/WO Transaction Drilldown – Find each invoice by vendor/subtrade/employee per project

Job Cost

  • JC Original Estimate – Shows a breakdown of the initial estimate uploaded to VP
  • JC Phase Codes – Shows the master code list used for all projects
  • JC Jobs – Lists important project information such as PM, Super, reviewing consultant/owner, job phase codes, contract items (how is this different from PM Projects?)
  • JC Job Phases – Shows code list for all projects (How is this different from JC Phase Master?)
  • JC Details – Not sure exactly what this one is for
  • JC Committed Cost Drilldown – Breakdown of all committed costs by project phase code
  • JC Cost Totals Drilldown – Ability to pull backup for each cost recorded under the project

Subcontract Ledger

  • SL Subcontract Status Report – A breakdown of a subcontractor’s contract amount, and changes paid to the subcontractor to date

Project Management

Purchase Order

  • PO Drilldown – Each individual PO for the specified project is listed in alphabetical order by vendor

Non Viewpoint Reference

  • Synergy ACA Form (A-2013) – The standard Alberta Construction Association contract template. The template pulls information from PM Subcontract Detail and PM Subcontracts
  • Project Cost and Forecast and Project Cost and Forecast Letter Size – The project forecast report at a certain specified time interval