Difference between revisions of "Document Controls"

From SynWiki
Jump to navigation Jump to search
Line 2: Line 2:
 
=== Objective ===
 
=== Objective ===
 
To establish a basic workflow demonstration of Document Control management, including drawing update, RFIs and Submittals. Document control process a lot of times are over looked at, but mismanagement on this step can make the later part of project very challenging, especially when the project is mid to large size. Sometime the client has special requirements on this topic, please refer to specifications or other contract documents.
 
To establish a basic workflow demonstration of Document Control management, including drawing update, RFIs and Submittals. Document control process a lot of times are over looked at, but mismanagement on this step can make the later part of project very challenging, especially when the project is mid to large size. Sometime the client has special requirements on this topic, please refer to specifications or other contract documents.
 +
 +
== Drawings management ==
  
 
== RFI management ==
 
== RFI management ==
  
 
== Submittal Management ==
 
== Submittal Management ==

Revision as of 17:53, 24 January 2023

Introduction

Objective

To establish a basic workflow demonstration of Document Control management, including drawing update, RFIs and Submittals. Document control process a lot of times are over looked at, but mismanagement on this step can make the later part of project very challenging, especially when the project is mid to large size. Sometime the client has special requirements on this topic, please refer to specifications or other contract documents.

Drawings management

RFI management

Submittal Management