Difference between revisions of "List of Content"
Jump to navigation
Jump to search
Carsen der (talk | contribs) |
Siyuan wei (talk | contribs) |
||
| Line 69: | Line 69: | ||
*[[Timecard - Submitting|Submitting a Timecard]] | *[[Timecard - Submitting|Submitting a Timecard]] | ||
*[[Timecard - Report|Viewing the Timecard Report]] | *[[Timecard - Report|Viewing the Timecard Report]] | ||
| + | |||
| + | === Estimating Submission Summary === | ||
| + | |||
| + | * Download and Install | ||
| + | * Load report and printing report | ||
--------------------- | --------------------- | ||
Revision as of 20:20, 1 August 2023
“Rocks in my path? I keep them all.
With them I shall build my castle.”
– Nemo Nox
Project Management Items (what is/how to)
Viewpoint Fundamentals
- Introduction to Viewpoint
- Cost Item vs Cost Code
- Viewpoint Quick Reference
- Viewpoint Terminology
- Viewpoint Report Module
Operation / PM Duty Items
- Budget Upload
- Subcontract Management
- Project Change Management
- Document Controls
- Project Cost and Forecast - Pending Decision on Future PM software suite
- Cash Flow Projection
- Viewpoint Reports
- Change Order Log
- Submittal and RFI log
- JC Cost Totals Drilldown
- Project Cost and Forecast
- Project Close Out
Creating Projection CodesForecasting with PM Cost Projections- Finance Calendar
Sequence Diagram for Typical Processes
- Development and Building Permits
- Demo Permit Process
- How to: Get Utility - Gas
- How to: Get Utility - Water
- How to: Get Utility - Power
- Project Close Out Process
Estimating Items (what is/how to)
SGC Submission Review Procedures
Converting PDF to Excel
Estimate 2.0 (Software)
Estimating Timecard
Estimating Submission Summary
- Download and Install
- Load report and printing report